£70/day + VAT
£84.00 a day inc VAT
Self-drive Hire Rates
| Period | Rate (ex-VAT) | Inc VAT |
|---|---|---|
| 1 Day (24h) | £70.00 | £84.00 |
| 2 Days | £145.00 | £174.00 |
| 3 Days | £220.00 | £264.00 |
| Week (7 days) | £295.00 | £354.00 |
| Extra day (after a week) | £55.00 | £66.00 |
| Month (30 days) | £995.00 | £1194.00 |
No insurance needed to hire. You're responsible for the machine while it's with you. You can get a hired-in plant insurance quote at checkout.
Micro Digger Hire Redditch - Kubota K008-5
Micro Power — Maximum Access
Book Your Rental
Select your desired rental dates.
Dotted dates have one delivery slot left. All times are UK time.
Booked online or by phone? You can cancel within 14 days. See section 17 of our terms.
Prefer to call? 01902 213089
Description
Ideal for landscapers and domestic builders who need power in tight spaces. Book online today — delivered next day, often same day, subject to availability.
Features & Benefits
- Fits through gaps wider than 75 cm for garden or side-access work
- Variable tracks (700–860 mm) for stability on site
- Dig depth 1.72 m for drainage & cable runs
- Breaker lines fitted — plug & play for concrete breaking
- Supplied with 3 buckets (12”, 24”, 36”) & quick hitch
- Stage V Kubota engine = quiet and fuel-efficient
Specifications
Dig Depth
1.72 m
Est. Fuel Consumption
0.6–1.0 L/hr
Width
70 cm (tracks retracted)
Aux Flow
21 L/min
Operating Weight
1,050 kg
Engine
7.6 kW Kubota
On-Site User Guide
Everything you need to operate this machine safely and confidently.
Footpath homes in Redditch
On estates such as Church Hill and Winyates, the machine often has to travel along a footpath and through a side gate. The K008-5 is 75 cm wide and light enough not to mark a path.
Soakaways in Redditch clay need a percolation test and must sit at least 5 m from the house. The K008-5 digs the test pit first, then the soakaway if the ground passes.
In the Church Green and Feckenham conservation areas, give the council six weeks notice before cutting or removing a tree.
Before the K008-5 arrives
- Walk the route from the road to the dig and measure the gate.
- Lay boards over grass or block paving.
- Check conservation-area rules before tree work.
- Have an adult on site for the handover.